
Pump control panels
Duplex Pump Control Panels
Two-pump control for lift stations and septic pump systems, with standard alternator or PLC-based designs. Built in North Fort Myers and shipped nationwide.
Available electrical configurations
- 120V single-phase
- 240V single-phase
- 120/240V dual-voltage
- 240V three-phase
- 480V three-phase
Built in North Fort Myers, FL · Ships nationwide · Quotes Mon–Fri, 8am–4pm
How a duplex panel works
A duplex panel runs two submersible pumps in the same basin. Each cycle, the panel alternates which pump leads, so both pumps wear evenly. If the level keeps rising, the panel brings on the second pump. If the water reaches the alarm level, the panel alerts the owner.
Standard alternator or PLC-based control
- Standard alternator: an alternating relay switches the lead pump each cycle. It's the proven choice for typical lift stations and septic pump systems.
- PLC-based control: a programmable controller handles the sequencing. It's the right choice when the job needs more logic, timing or special operating modes.
What's inside the panel in the photos
The duplex lift station panel in the first photo includes:
- Separate generator and main breakers with a mechanical interlock
- Individual pump breakers
- An alternating relay with indicator lights for pump 1 and pump 2
- Hand-Off-Auto switches for each pump
- Clearly labeled terminal strips and wiring
Every job is different, so tell us what your station needs and we'll build to it.
Choose by your pump's electrical supply
| Configuration | Typical use |
|---|---|
| 120V single-phase | Smaller residential duplex systems |
| 240V single-phase | Residential and light commercial lift stations |
| 120/240V dual-voltage | One panel design for either pump voltage |
| 240V three-phase | Commercial lift stations |
| 480V three-phase | Larger commercial and industrial lift stations |
Common applications
- Commercial, HOA and multi-building lift stations
- Septic pump tanks where a backup pump is required
- Replacement of failed or storm-damaged duplex panels
Need a panel built to an engineer's spec? See custom control panels.
Questions about duplex pump control panels
When do I need a duplex panel instead of a simplex?
Use duplex when the station has two pumps, either for capacity (both can run at high flow) or for redundancy (one backs up the other). Most commercial and multi-building lift stations are duplex.
What's the difference between alternator and PLC-based control?
A standard alternator design uses an alternating relay to switch the lead pump each cycle. It's simple and proven. A PLC-based design uses a programmable controller, which makes sense when the job needs more sequencing, timing or special logic. We build both and can help you choose.
Can you build a duplex panel for 480V three-phase pumps?
Yes. We build duplex panels for 240V and 480V three-phase, as well as 120V, 240V and 120/240V dual-voltage single-phase.
Can a duplex panel have a generator input?
The panel in the photo above has separate generator and main breakers with an interlock. If you need a generator connection, tell us on the quote form and we'll include it in the build.
Ready to price a panel?
Tell us the pump, the voltage and the job. You don't need every spec to ask.